Applying for a partial building permit for the construction of a system

  • Service description

    If a building application has been submitted, the start of construction work for the excavation pit and for individual parts or construction phases of the project can be approved on application before the building permit is issued (partial building permit) in accordance with Section 73 (1) of the Rhineland-Palatinate State Building Regulations (LBauO).

    The subject of the partial building permit is, on the one hand - as an enacting part - the approval of the preparatory construction measures. On the other hand, the partial building permit - as a declaratory part - contains a so-called "preliminary positive overall judgment" with regard to the basic approvability of the overall project.

  • Procedure

    Application to the lower building supervisory authority. The granting of a partial building permit is at the discretion of the lower building supervisory authority.

  • Responsible body

    The lower building supervisory authority is responsible for issuing a partial building permit. This is the district administration, in independent and large towns belonging to the district, the municipal administration or the association municipality administration if it has been assigned building supervision tasks (Diez and Konz association municipality administrations).

  • What documents are required?

    A partial building permit can only be granted upon written application; this must be accompanied by all documents required for assessment. As the scope of the required documents depends on the scope of the construction work to be approved, it is not possible to make general statements in this regard. These must be determined in consultation with the locally responsible lower building supervisory authority.

  • Legal basis

  • Legal remedy

    Objection and complaint

  • Typing

    4
  • Library entry status

    2
  • Catalog entry status

    2

Start your request directly online

Who should I contact?

The lower building supervisory authority is responsible for issuing a partial building permit. This is the district administration, in independent and large towns belonging to the district, the municipal administration or the association municipality administration if it has been assigned building supervision tasks (Diez and Konz association municipality administrations).

Responsible departments

Responsible employees

Help with accessibility

  • General

    We make every effort to ensure that our websites are accessible. You can find details on this in our accessibility statement. You can send us suggestions for improvement using our feedback form.

  • Font size

    To adjust the font size, please use the following key combinations:

    Larger

    Ctrl
    +

    Smaller

    Ctrl
  • Keyboard navigation

    Use TAB and SHIFT + TAB to navigate through next/previous links, form elements and buttons.

    Use ENTER to open links and interact with elements.

Select language