To carry out the work, the Nahe superstructure must be completely closed to traffic in this area from 9 am to 2.30 pm. The detour route is signposted. Traffic coming from Birkenfeld will be diverted from the B41 onto the L176 (Panzerstraße) at the intersection near the Enzweiler district and routed back onto the Nahe superstructure via Am Rilchenberg, Nordtorstraße and the Mainzer Straße connecting branch. At this point, traffic coming from Bad Kreuznach will be diverted via the Hauptstraße link road and routed back onto the B 41 via Emil-Kirschmann-Brücke, Mainzer Straße, Nordtorstraße, Am Rilchenberg and L176 at the intersection. A map of the detour route can be found on the city's website at www.idar-oberstein.de/baustellen.
The city administration asks road users for their understanding for the obstructions caused by the work.